top of page
ECO CONCEPT.PNG

The Coral Harbour Solar Facility

Eco Energy Bahamas was selected by the Ministry of Energy and Transport as one of three Independent Power Producers in New Providence to deliver utility-scale renewable generation under the national energy program.

In Partnership With

Bahamas Power & Light
Ministry of Energy & Transport

Date

April 2025

Role

Independent Power Producer

Project Overview

Eco Energy Bahamas’ Coral Harbour Solar Project is a 25 MWp PV installation on approximately 93 acres in New Providence, coupled with a 5–10 MWh battery storage system and enhanced grid stability. It operates under a 25-year PPA with BPL and an URCA IPPL. The expected output is 53 gigawatt-hours (GWh) per year, resulting in reduced diesel consumption and emissions. The project emphasizes Bahamian jobs, local contractors, and strong environmental and safety standards.

Installing Solar Panels
Transparent-1.png

GET IN TOUCH

Tel. 123-456-7890
info@mysite.com
500 Terry Francois St.

MENU

Home

About

Services

FOLLOW US

Facebook

Instagram

Linkedin

OPENING HOURS

Mon - Fri: 8am - 8pm
Saturday: 9am - 7pm
Sunday: 9am - 8pm

Web design by Design Studio Name

© 2035 by Site Name. Created on Wix Studio.

bottom of page