
The Coral Harbour Solar Facility
Eco Energy Bahamas was selected by the Ministry of Energy and Transport as one of three Independent Power Producers in New Providence to deliver utility-scale renewable generation under the national energy program.
In Partnership With
Bahamas Power & Light
Ministry of Energy & Transport
Date
April 2025
Role
Independent Power Producer
Project Overview
Eco Energy Bahamas’ Coral Harbour Solar Project is a 25 MWp PV installation on approximately 93 acres in New Providence, coupled with a 5–10 MWh battery storage system and enhanced grid stability. It operates under a 25-year PPA with BPL and an URCA IPPL. The expected output is 53 gigawatt-hours (GWh) per year, resulting in reduced diesel consumption and emissions. The project emphasizes Bahamian jobs, local contractors, and strong environmental and safety standards.


GET IN TOUCH
Tel. 123-456-7890
info@mysite.com
500 Terry Francois St.
MENU
Home
About
Services
FOLLOW US
Facebook
Instagram
Linkedin
OPENING HOURS
Mon - Fri: 8am - 8pm
Saturday: 9am - 7pm
Sunday: 9am - 8pm
Web design by Design Studio Name
© 2035 by Site Name. Created on Wix Studio.
